Guide 02 · Terms
FOB or CIF: who carries the risk on a used machine.
Take FOB unless you already have a forwarder you trust and a specific reason to hand control to the seller. On used heavy machinery a CIF price conceals roughly 15 to 30 % of the landed cost inside a number you cannot audit, and the insurance it includes is the one grade that excludes the damage used cranes actually suffer.
The short version
- Under CIF the risk passes when the goods are on board at the origin port, not when they reach yours. Paying freight to your port does not move the risk point.
- The CIF insurance minimum is Institute Cargo Clauses (C) — named perils only. Handling damage, rust and condensation are excluded, which is exactly how used cranes get damaged.
- Destination charges are never inside a CIF price: terminal handling, agency fees, storage and demurrage all land on you, uncapped.
- FOB buys you the carriage contract, the bill of lading in your name, and the insurance grade you choose — ICC (A), not the minimum.
- An EXW quote on Chinese machinery is a warning sign, not a bargain: you cannot lodge a Chinese export declaration without a Chinese entity.
On this page
The one thing almost every buyer gets wrong
Under CIF the risk passes to you when the goods are on board the vessel at the port of shipment — not when they arrive at your port. The seller pays the freight to the destination port, but stops being responsible for the goods the moment the last sling is released at Tianjin or Qingdao.
So a CIF quote is not a door-to-door promise. It is a freight-inclusive price with the risk sitting on you for the entire ocean leg, plus a minimum-grade insurance policy you did not choose, from a carrier you did not select, with a stow plan you never saw. That is the whole problem in one sentence.
What the terms actually allocate
There are eleven Incoterms 2020 rules. Six are relevant to used machinery. Read the risk-transfer column slowly, because that is where the money is decided.
| Term | Seller pays | Risk passes to buyer | Who picks the forwarder |
|---|---|---|---|
| EXW ex works | Nothing beyond making goods available at their premises | At the seller's gate | Buyer |
| FCA free carrier | Delivery to the named carrier, export clearance | On handover to the first carrier | Buyer |
| FOB free on board | Inland haulage to port, export clearance, loading on board | When goods are on board at origin port | Buyer |
| CFR cost and freight | FOB plus ocean freight | When goods are on board at origin port | Seller, but no insurance |
| CIF cost, insurance, freight | CFR plus insurance at ICC (C) minimum | When goods are on board at origin port | Seller |
| DAP delivered at place | Everything to the named place, not cleared for import | At the named destination place, ready for unloading | Seller |
| DDP delivered duty paid | Everything including import duty and VAT | At the named destination, cleared for import | Seller as importer of record |
Note what CFR and CIF do not change: the risk point stays at the origin port. Paying more freight does not buy you more protection. Only DAP and DDP move the risk point to your side of the ocean, and both cost materially more than the difference in freight, because the seller is now carrying the loss exposure.
Why CIF underperforms specifically on used machinery
1. The insurance minimum excludes your most likely loss
Incoterms 2020 requires the CIF seller to insure for 110 % of the contract value under Institute Cargo Clauses (C) at minimum. ICC (C) is a named-perils cover: total loss, sinking, stranding, fire, collision, discharging at a port of distress. It does not pay for handling damage, rust, condensation, theft or most partial loss.
Now consider what actually damages a used tower crane in transit: a jib chord bent by a crane hook during loading, paint and section damage from a shifted counterweight block, condensation inside a closed mast chord during a 35-day voyage through the tropics, a mast section dropped at the transhipment yard. Every one of those is a handling or atmospheric loss. Every one is outside ICC (C).
This is not a loophole, it is the designed minimum. Perversely, the 2020 revision raised CIP to ICC (A) — all risks — and deliberately left CIF at ICC (C), on the reasoning that CIF is used for bulk commodities where handling damage is not the main exposure. Used machinery is the opposite case, and the rules were not written with it in mind.
The practical consequence: on a CIF deal, ask what the cover actually is. If the answer is "ICC (C)" or "minimum", you are uninsured against the loss you are most likely to have. Buy ICC (A) yourself if you can; it typically costs a fraction of a percent more.
2. The seller chooses the stow, and the stow is the risk
A tower crane does not travel in a container. Mast sections, jib sections and counterweight blocks move as breakbulk or on out-of-gauge flat racks, and the quality of the stow plan — cradles, lashing points, separation between steel surfaces, protection of machined faces — determines whether the structure arrives straight.
Under CIF the seller nominates the carrier and agrees the stow. You inherit the result and you have no contractual relationship with the shipowner, which also means no direct claim against them. Under FOB you nominate the forwarder, you see the stow plan before loading, you can require a surveyor at the load port, and you hold the contract of carriage.
3. Destination charges are never in the price
THC, documentation fees, agency fees, terminal storage, customs examination, demurrage. None of these are in a CIF price, and at a congested port they are not small. A crane that sits three weeks in Apapa or Lagos generates demurrage and storage that can exceed the ocean freight on a single unit. Because the seller chose the carrier and the routing, the seller indirectly chose your demurrage exposure — but the bill arrives at your address.
4. You lose the bill of lading until late
Under CIF the seller is the shipper, so the B/L is issued to them and reaches you after sailing, sometimes after amendment. If you are paying by letter of credit, a document set that arrives late or with a discrepancy costs you a waiver fee and a delay you did not budget. Under FOB the B/L is issued in your name from the start.
The four lines a CIF quote always omits
| Line | Who pays it | Order of magnitude, 42 t crane, Tianjin to Lagos |
|---|---|---|
| Destination terminal handling and agency | Buyer | USD 2,500 – 5,000 |
| Demurrage and terminal storage beyond free time | Buyer | USD 100 – 300 per day, uncapped |
| Import duty, levies and VAT | Buyer | Budget 20 – 25 % of CIF value in Nigeria — verify with a licensed agent |
| Inland haulage from port to site, plus mobile crane for unloading and erection | Buyer | Often the largest single line after the machine itself |
What FOB actually buys you
- You own the carriage contract. If the vessel is delayed or the stow is wrong, you have a counterparty with standing.
- You buy the insurance grade you need. ICC (A), for the full value plus 10 %, with the loss payable in your currency at your address.
- You see the freight invoice. A CIF price bundles freight, and you cannot tell whether the margin is in the machine or in the shipping line.
- You can appoint a load-port surveyor to confirm the crane is complete and correctly lashed before the vessel sails, which is the cheapest moment in the entire transaction to discover a missing mast section.
- The B/L is in your name from day one, which matters if you are financing the purchase.
What FOB does not buy you is freedom from Chinese export formalities. Under FOB the seller still completes export declaration, and that is by design: a foreign buyer cannot normally lodge a Chinese export declaration without a Chinese entity. This is also why an EXW quote on Chinese machinery is usually a warning sign rather than a bargain — the seller is quietly handing you a process you cannot perform.
When CIF is the right answer
CIF is not wrong everywhere. It is reasonable when:
- You have no forwarder relationship and the seller ships this route monthly, so their rate genuinely beats yours.
- The cargo is low-value, containerised and homogeneous, where ICC (C) covers the realistic loss.
- You are buying a small item where the administrative cost of arranging carriage exceeds the freight itself.
None of those describe a 40-tonne tower crane with an 80 m jib. For that, FOB, plus your own ICC (A) policy, plus a load-port survey, is the configuration that keeps control where the risk is.
Seven clauses to put in the contract
- Named port and named place — "FOB Tianjin Xingang, Incoterms 2020", never "FOB China".
- Component schedule attached — mast sections by count and length, jib sections, counterweight blocks by weight, so a missing item is a breach and not an argument.
- Document set listed — commercial invoice stating used condition and year, packing list with per-package weights and dimensions, certificate of origin, nameplate photographs, and any destination-specific certificate named explicitly.
- Inspection before loading — buyer's right to appoint a surveyor at the seller's yard or the load port, at buyer's cost, with a named notice period.
- Loading window and laycan — a stated period, and what happens to storage cost if the vessel is late.
- Title and risk — title passes on payment in full; risk per the Incoterm. Keep them separate, they are not the same event.
- Photographic record — the seller photographs each package closed and lashed, and sends the set before sailing. This one clause resolves most damage claims before they start.
On payment terms
Standard practice on used machinery is a deposit with the balance against a copy B/L, or a confirmed irrevocable letter of credit. Two observations from this side of the transaction. A deposit protects the seller against a buyer who walks after dismantling has begun, which is a real cost — dismantling is 5 to 10 days of mobile crane time. And an LC only helps if the document set matches; a discrepancy in the invoice description of a used machine is the most common cause of a refused presentation, so agree the exact invoice wording before the LC is opened, not after.
Frequently asked
Under CIF, when does risk transfer?
When the goods are on board the vessel at the port of shipment — not on arrival. The seller pays freight to the destination port but is not liable for the ocean leg. That is what the insurance is for, and the minimum grade is weaker than most buyers assume.
What is the minimum insurance under CIF?
Institute Cargo Clauses (C), 110 % of contract value, in the contract currency. Named perils only: total loss, sinking, stranding, fire, collision, discharge at a port of distress. Handling damage, rust, condensation and theft are excluded. CIP was raised to ICC (A) in 2020; CIF was not.
Can a Chinese supplier quote DDP to my country?
Rarely, and cheap DDP deserves suspicion. DDP makes the seller the importer of record, which needs a local tax registration and customs account. Without a registered entity, a "DDP" price is usually DAP relabelled or an under-declaration. Ask which legal entity will be the importer of record.
Why is FOB better for used tower cranes?
Because used cranes move as breakbulk or out-of-gauge, where the stow decides whether the structure arrives straight; because the CIF insurance minimum excludes handling damage; and because destination charges are never in the CIF price, so the two numbers cannot be compared without adding them back.
Who clears export customs in China under FOB?
The seller. FOB requires the seller to deliver on board and complete export clearance. A foreign buyer cannot normally lodge a Chinese export declaration without a Chinese entity — which is why FOB is the practical floor for overseas buyers.