Guides
What you need to know before you buy.
Three guides cover a used tower crane purchase end to end: a 14-point inspection sheet, the six Incoterms 2020 rules that decide who carries the risk between Tianjin and your port, and the twelve documents that clear a crane into Lagos in 8 to 14 weeks. Read about 3,000 words and you can price, inspect and land the machine yourself.
Most used-machinery content online is written to be found rather than to be used. These are written the other way round. A buyer who reads all three can size a machine against a real lift, inspect it in a day with a tape measure and an ultrasonic gauge, argue Incoterms with a freight forwarder, and budget a Nigerian landing within about ten per cent. That is the standard we hold them to, and each guide states plainly where our own commercial interest sits.
Which guide answers your question
| Your question | Guide | What you get |
|---|---|---|
| Is this crane big enough for my lifts? | 1. Choosing | Moment calculation, model-code decoder, 14-point sheet |
| Why is the chart different from the badge? | 1. Choosing | Rated moment versus maximum load, with the t·m / kN·m conversion |
| Who carries the risk once it leaves China? | 2. FOB vs CIF | Seven-term allocation table, risk-transfer point for each |
| Is the CIF insurance good enough? | 2. FOB vs CIF | Why ICC (C) excludes handling damage, rust and condensation |
| What will it cost to land in Nigeria? | 3. Nigeria | Duty build-up, 20–25 % of CIF, plus the twelve documents |
| How long until it is standing on site? | 3. Nigeria | Stage-by-stage timeline, 8 to 14 weeks door to site |
How to choose a used tower crane
For the moment you are deciding which machine to buy. Five checks in the order that matters: rated moment at your real working radius rather than the tonnage on the badge, jib length and whether it can be shortened legally, free-standing height in the configuration you actually need, fatigue and corrosion evidence at weld toes and inside closed sections, and documentation. Includes a worked moment calculation for a 6 t panel at 45 m, a decoder for model codes such as XGT8040-25 and T600-32U, a 14-point inspection sheet, and the seven findings that mean walk away.
FOB or CIF on used machinery
For the moment the quotation lands and you compare two numbers. Under CIF the risk passes when the goods are on board at the origin port, not on arrival — and the insurance the seller must buy is Institute Cargo Clauses (C), a named-perils cover that excludes handling damage, rust and condensation, which are precisely the losses a used crane suffers in transit. Sets out what all six relevant Incoterms 2020 rules allocate, the four lines a CIF quote always omits, seven clauses to put in the contract, and why an EXW quote on Chinese machinery is usually a warning sign rather than a bargain.
Shipping a used tower crane to Nigeria
For the moment you are budgeting the landing, not the machine. Tianjin or Qingdao to Lagos is 30 to 42 days on the water, but door to site is 8 to 14 weeks and clearance is the variable that most often doubles it. Covers the breakbulk and out-of-gauge stow plan and why a tower crane is not a container job, the sequential Nigerian document chain from Form M through PAAR, the duty build-up that lands at 20 to 25 % of CIF, a twelve-document checklist and the six things buyers get wrong in frequency order.
How to use these three together
The order is not arbitrary. Selection decides whether the machine can do your lifts at all; Incoterms decide who carries the risk between the seller's yard and your port; the destination guide decides what the machine costs once it is standing at Apapa. Buyers who skip the first step overpay for capacity they will not use. Buyers who skip the second discover at arrival that they were uninsured against the damage they have. Buyers who skip the third have a machine at the port they cannot afford to clear.
If you would rather skip the reading, send us the lift, the radius, the height and the discharge port. We will answer with a costed configuration instead of a range — see the stock page or the two fully documented large-crane records, ZOOMLION T600-32U and XCMG XGT8040-25.
Frequently asked
Why are the machines not priced on this site?
Because the honest number depends on configuration, documentation and terms rather than on model and year alone. Two XCMG XGT8040-25 cranes of the same age can differ by a third on remaining fatigue life and on whether the mast sections and counterweight travel with the machine. We quote per order and answer with a costed configuration instead of a range.
Do these guides apply outside Nigeria?
The first two do: rated moment, load charts, inspection and the Incoterms allocation are the same whether the machine lands in Lagos, Mombasa, Jebel Ali or Santos. Only the third guide is country-specific, because the document chain — Form M, PAAR, SONCAP, CCVO — is a Nigerian sequence and other destinations differ. The stow and breakbulk sections of that guide still apply everywhere.
Can I inspect a machine before buying from China?
Yes, and the first guide explains what to look at in a single day. Either come to the yard in Gansu, or appoint a surveyor and require photographs of the nameplate, the load chart and the mast section serials as a condition of the deposit. Our listed units carry the plate data photographed in full so the first pass can be done from the files.
What is the shortest realistic timeline?
Eight weeks from signed contract to machine on site, assuming the buyer has a registered company, a Form M channel and a clearing agent already in place, and the vessel sails on schedule. Fourteen weeks is the honest planning figure. Dismantling, loading and Nigerian clearance are each capable of adding a week without anything going wrong.